Category Archives: Electrical

SFPUC Southeast WPCP Disinfection Upgrades

Below are photos depicting the installation of conduits under the building slab for the new electrical and control building. Advertisements

Posted in Electrical

BART Substation RRY Project

Work is progressing at the BART Richmond Yard Substation Replacement Project. Work includes installation of district furnished DC Switchgear and Transformer on top of a new poured in place cable vault at at existing active maintenance yard. The picture below … Continue reading

Posted in Electrical

EBMUD Rate Control Station Rehab

BCI recently completed a project for EBMUD that involved rehabilitating electrical and mechanical components at 2 rate control station locations. Below are some pictures depicting the installation of a 24″ ball valve, as well as electrical upgrades. Replacement of the … Continue reading

Posted in Electrical, General Contracting, Mechanical

Gilroy WWTP Preanoxic Basin Project

Work is nearing completion at the WWTP upgrade project in Gilroy, CA. The picture below depicts some of the installation work for a new 21kv Substation to power the new MCC’s, Oxidation Ditch 200HP Blowers, and Distribution Panels.

Posted in Electrical

SFPUC Groundwater Supply Well Stations

Work is continuing at the (5) Groundwater Well Sites in San Francisco. Below are progress pictures depicting work at some of the locations.

Posted in Electrical

BART Transformer Replacement Projects

BCI recently completed the removal, replacement, and relocation work for (12) 34.5kv transformers throughout BART system. Below are pictures showing some of the installation work and tight working spaces. Work had to be coordinated closely with BART to prevent shutting down … Continue reading

Posted in Electrical, General Contracting

Folsom Dam Project Update

Progress pictures from Folsom Dam project. Conduits along the spillway have been installed and this fourth phase of the project is nearing completion.

Posted in Electrical